1300 662 382
Safety management plans · Adelaide

Safety management plans that hold up on site

A safety management plan sets out how health and safety will be managed on a particular project, contract or site: who is responsible, how contractors coordinate, what happens if something goes wrong and the site rules. Larger construction projects need a written WHS management plan before work starts, and head contractors and major customers often ask for one on smaller jobs too. EMC writes plans around your project and helps you keep them current while the work goes on. The environmental side of a project sits in a construction environmental management plan.

  • Site-specific, not generic
  • SWMS checked against the plan
  • Kept current while the work goes on
01When you need one

When you need a safety management plan

On larger construction projects, a written WHS management plan is required before work starts, and it's the principal contractor's job to prepare it. The principal contractor is usually the business that commissions the project, unless it appoints another business to manage the site. Your state's SafeWork or WorkSafe website sets out when a plan is required where you work.

Outside construction projects, plenty of people still ask for a plan. Head contractors, government buyers and large customers often want a contract-specific or site-specific safety plan before you start. The same principles apply: specific to the work, clear about who does what, and kept current.

A plan covers one project. If what you need is a way of managing safety across the whole business, that's a WHS management system built to ISO 45001, and each project plan then draws on it.

02What goes in

What goes in a WHS management plan

A plan that works on site usually covers:

  • the names, positions and safety responsibilities of the people running the project
  • how the businesses on site consult, cooperate and coordinate their work
  • how incidents will be managed and reported
  • the site safety rules, and how everyone on site will be told about them
  • how safe work method statements (SWMS) are collected, checked, monitored and reviewed
  • the project's main risks and how they'll be controlled
  • inductions, emergency arrangements, first aid, and traffic and plant movement
  • how and when the plan itself will be reviewed

If your business already runs a WHS management system, most of this comes straight from it, and the plan only needs the parts that are specific to the project.

03SWMS

Safe work method statements and the plan

High risk construction work, such as work at height, in trenches, near energised electrical services, near powered mobile plant, or involving demolition or asbestos, needs a safe work method statement (SWMS) before it starts. The SWMS sets out the high risk work, the hazards, the controls and how they'll be put in place, monitored and reviewed.

On a construction project, each SWMS should fit with the WHS management plan, and a copy goes to the principal contractor before the work starts. A generic SWMS isn't good enough unless it's been reviewed and revised for the specific site and the way the work will be done. Checking SWMS against the plan and the actual site is one of the most useful things a principal contractor can do.

What counts as high risk construction work is set by each state, and it does change, so check your state's SafeWork or WorkSafe regulator's website for the current list where you work.

04On site

Keeping the plan current on site

A plan written at tender and left in the site office doesn't do its job. A plan that works:

  • is explained to everyone who works on the project before they start, and they know where to find it
  • is reviewed and updated as the work changes, and workers are told about the changes
  • is kept, with its records, for as long as the project runs and afterwards

In practice, review the plan when the work changes stage, a new contractor arrives, a new hazard appears, a control isn't working or there's an incident. SWMS need the same attention: review them when the controls they rely on change, and stop the work if it isn't being done the way the SWMS says.

05How we help

How we help

How we help01

Understand the project

Scope, programme, contractors, site constraints and the high risk work involved.

How we help02

Write the plan

A WHS management plan or safety plan that reads like your project, not a template.

How we help03

Check the SWMS

We review the SWMS your contractors provide against the plan and the site, and flag what needs revising.

How we help04

Brief the site team

Your supervisors know what the plan says and how to keep it current. Tailored in-house training is available on request.

How we help05

Review during the job

Check-ins or a site safety audit part-way through, to make sure the plan still matches the work.

06Cost

What a safety management plan costs

It depends on the size of the project, how many contractors and how much high risk construction work is involved, and whether you want ongoing reviews. We quote once we know the scope. The quote is fixed before we start. If your business runs several projects a year, a set of WHS policies and procedures behind every plan saves rewriting the basics each time: see WHS policies and compliance.

07FAQs

Frequently asked questions

When do you need a WHS management plan?

Larger construction projects need a written WHS management plan, prepared by the principal contractor before work starts. Outside construction, head contractors, government buyers and large customers often ask for a contract or site safety plan before you start. Your state's SafeWork or WorkSafe website explains when a plan is required where you work.

Who is the principal contractor?

Usually the business that commissions the construction project, unless it appoints another business to manage the site and take on that role.

What's the difference between a WHS management plan and a SWMS?

The WHS management plan covers the whole project and is the principal contractor's job. A safe work method statement (SWMS) covers one piece of high risk construction work and is prepared by the business doing that work, then given to the principal contractor before it starts.

Is a generic SWMS good enough?

Not on its own. A SWMS needs to match the actual site and the way the work will be done there. A generic one has to be reviewed and revised for the job before it's used.

Can you write our safety management plan?

Yes. We write WHS management plans and safety plans around your project and site, and can check the SWMS your contractors give you. We quote once we know the scope. If your whole business needs a system rather than a project plan, see building a WHS management system.

Next step

Not sure where to start?

Tell us where you're at and we'll tell you honestly what you need, and what you don't.